{"id":953,"date":"2018-11-02T09:49:50","date_gmt":"2018-11-02T16:49:50","guid":{"rendered":"http:\/\/www.impcorporation.com\/completed-projects\/?p=953"},"modified":"2018-11-02T11:15:09","modified_gmt":"2018-11-02T18:15:09","slug":"16mw-natural-gas-power-plant-relocated-from-alaskan-oil-rig","status":"publish","type":"post","link":"https:\/\/www.impcorporation.com\/completed-projects\/16mw-natural-gas-power-plant-relocated-from-alaskan-oil-rig","title":{"rendered":"16MW Natural Gas Power Plant Relocated from Alaskan Oil Rig"},"content":{"rendered":"<p>IMP was enlisted to supply a client with a 15MW modular gas power plant that could be quickly deployed.\u00a0 IMP identified a large power plant at an on-shore rig in Alaska that was being decommissioned, and arranged the acquisition.\u00a0 Logistically, with a narrow navigation window, moving the power plant\u2013totaling more than 695 tons\u2013proved difficult, especially with the thick sea ice surrounding most of the outer island.\u00a0 The decision was made to dismantle the plant into its separate modules and split the load between two barges in order to facilitate the relocation.<\/p>\n<p><a href=\"http:\/\/completedprojects.impcorporation.com\/wp-content\/uploads\/2018\/11\/CP_natural-gas-powerplant_BP_18699_09192018-min.pdf\" target=\"_blank\" rel=\"noopener\">View PDF<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>IMP was enlisted to supply a client with a 15MW modular gas power plant that could be quickly deployed.\u00a0 IMP identified a large power plant at an on-shore rig in Alaska that was being decommissioned, and arranged the acquisition.\u00a0 Logistically, with a narrow navigation window, moving the power plant\u2013totaling more than 695 tons\u2013proved difficult, especially&#8230; <a class=\"excerpt-link\" href=\"https:\/\/www.impcorporation.com\/completed-projects\/16mw-natural-gas-power-plant-relocated-from-alaskan-oil-rig\">Continue Reading<i class=\"fa fa-long-arrow-right\"><\/i><\/a><\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/posts\/953"}],"collection":[{"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/comments?post=953"}],"version-history":[{"count":2,"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/posts\/953\/revisions"}],"predecessor-version":[{"id":956,"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/posts\/953\/revisions\/956"}],"wp:attachment":[{"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/media?parent=953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/categories?post=953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.impcorporation.com\/completed-projects\/wp-json\/wp\/v2\/tags?post=953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}